Mon–Fri: 7am–5pm|Sat: By Appointment|Sun: Closed
Foundation backfilling in Northern Colorado

Excavation Services

Foundation
Backfilling

Proper backfill protects your foundation for decades. We compact in lifts, grade to drain, and never rush — because settling isn't something you can fix later.

What We Do

Backfill Done Right,
The First Time

Foundation backfill looks simple — just push dirt against the wall? Wrong. Improper backfill causes settling that cracks driveways, pulls landscaping away, and creates pathways for water.

We place backfill in controlled lifts, compact each layer to proper density, and grade the final surface to direct water away. It takes longer than just pushing dirt in, but it's the only way to do it right.

Compaction in proper lifts
No heavy equipment against walls
Grade slopes away from foundation
Works with waterproofing systems
Native or imported fill available
Coordinates with GC schedules
Based in Loveland, CO
Larimer & Weld County service

Ready to Start?

Get a Free Estimate

Let's get your foundation protected the right way.

(970) 391-0184 Send a Message

Applications

When You Need Backfill

New Home Construction

Filling around new residential foundations after waterproofing and drainage are complete.

Additions & Extensions

New foundation walls for additions need proper backfill to match existing grade and drainage.

Waterproofing Repairs

After exterior waterproofing repairs, we backfill with proper drainage material.

Retaining Walls

Proper backfill and drainage behind retaining walls prevents hydrostatic pressure problems.

Commercial Foundations

Larger footings and deeper foundations need engineered backfill compacted in lifts.

Utility Trench Backfill

After utility work around foundations, we restore proper compaction and grade.

How It Works

Our Process

01

Inspection

Verify waterproofing, drainage, and inspections are complete before any backfill begins.

02

Material Selection

Choose appropriate material — native soil, granular fill, or engineered mix per specs.

03

Lift Placement

Place material in 6–12 inch lifts. Never dump full depth at once.

04

Compaction

Compact each lift with plate compactor. Hit density specs without damaging foundation.

05

Grade to Drain

Final grade slopes away — minimum 6 inches over the first 10 feet.

06

Surface Prep

Leave surface ready for landscaping, hardscape, or final grade work.

Our Work

Project Gallery

Common Questions

Foundation Backfill FAQ

Most residential foundations need 7 days minimum, though many specs require 14 days or until concrete reaches 75% of design strength. We follow your engineer's specifications.

Ready to break ground? Get a free estimate.

Got a project in mind or just curious about what we can do? Don't let it sit on the back burner. Give us a shout and let's chat about how we can make your vision a reality. No job too big, no hole too small.

  • Free Inspections & Estimates
  • Customized Project Plans
  • Full-Service Excavation Solutions
  • Friendly, Professional Service
Call (970) 391-0184